ComplianceState Reference

Georgia Dental Waterline Requirements

Dental unit waterlines must be tested at least quarterly, with a testing and maintenance log retained for at least five years.

Published by LineTabUpdated Sources checked

What the cited provision requires

Ga. Comp. R. & Regs. r. 150-8-.05; this page summarizes the cited provision, not every applicable rule
RequirementDetails
Water quality standardWater used for nonsurgical procedures must meet the EPA regulatory standard of 500 or fewer CFU/mL.
Testing frequencyAt least quarterly.
Sampling methodLines may be tested individually or as a pooled sample of up to ten lines using an equal volume from each.
After plumbing workTest within 30 days of repair or changes to plumbing.
RecordsA log of testing and maintenance, including dates, the individuals who performed it, and independent testing reports, retained for at least five years.

Sources: Georgia official legislative or administrative source: Ga. Comp. R. & Regs. r. 150-8-.05

Apply the requirement to your practice record

  • List every unit and waterline, with the equipment instructions and required sample schedule.
  • If pooling is permitted, record included lines, equal-volume collection, and the applicable limit on lines per sample.
  • Keep the collector, dates, method, report, treatment, and any corrective-action and retest record together.
  • Review plumbing or equipment changes for additional test triggers, and retain records for the required period.
Evidence trail

Sources

  1. 01
    Ga. Comp. R. & Regs. r. 150-8-.05Georgia official legislative or administrative source · Last checked October 5, 2026

Requirements vary by state and by equipment manufacturer. Always follow your dental unit and treatment product instructions for use, and confirm current rules with your state dental board.